Home Work
More Stuff Done
Unpacked another chunk of boxes
Purchased hide-a-bed for library
Scheduled kitchen contractors; did walkthrough with cabinet maker
More outlets and switches replaces
Purchased new dishwasher
Sewing room equipment/shelving set up
First load of cardboard and packing paper to recycling center
Still To Do
Stain the rest of the downstairs wood
Trim three downstairs doors and rehang them
Replace doorknob hardware
Replace outlets and switches in the other rooms
Install track lighting in hallways
Outdoor lighting on front walk and parking area
Unpack about ten thousand more boxes
Unpacked another chunk of boxes
Purchased hide-a-bed for library
Scheduled kitchen contractors; did walkthrough with cabinet maker
More outlets and switches replaces
Purchased new dishwasher
Sewing room equipment/shelving set up
First load of cardboard and packing paper to recycling center
Still To Do
Stain the rest of the downstairs wood
Trim three downstairs doors and rehang them
Replace doorknob hardware
Replace outlets and switches in the other rooms
Install track lighting in hallways
Outdoor lighting on front walk and parking area
Unpack about ten thousand more boxes